HOME Ideas - YouTube
Anxious to start living their dream, and moved into their small (420 square feet, plus a 200-square-foot sleeping loft) The conversion has cost them about $12,000 so far, Indestructible Off the Grid monolithic concrete homes. ... View Video
EXHIBIT B - The Quantum Companies
Lighting: 2 x 4 florescent troffers per the building drawings will be provided by The capacity intended for retail is 375 square feet per ton and food service spaces are 180 square Plumbing fixtures and accessories shall be of commercial quality and shall be of water conserving type ... Fetch Content
R E V I S E D - Southbridge , Massachusetts
Retail uses are not to exceed 6,000 total square feet of gross. floor space per subdivision or apartment development..72 The fee shall include the cost of advertisement and notification of all parties in interest Inlets shall be set on a base of either poured, concrete 8" in ... Read Full Source
CHAPTER 2
Based on soil conditions and on the maximum loads anticipated or not less than 4,000 pound wheel load and a 40 pounds per square inch Single layer poured in-place 3,000-4,000 PSI rigid or a pipe of equivalent cost. Except under the concrete floor slab, cast iron soil pipe may ... View Document
Remodel 2009-2010 Cost Vs Value Report
©2009 Hanley Wood, LLC. Republication or dissemination of Remodeling’s 2009–10 Cost vs. Value Report is expressly prohibited without thewritten permission of Hanley Wood, LLC. ... Read Here
Office Of Facilities Planning - Newsletter 31 - P-12 : NYSED
Carpet, Radiant Floor Panel Test Class 1 Square feet / floor* * If Actual exceeds Permitted, demonstrate on Code Compliance Drawings the area modifications permitted per Sections 506 and 507.7. a. Floors: poured concrete. b. Walls: ... Retrieve Content
One World Trade Center - Wikipedia, The Free Encyclopedia
On November 18, 2006, 400 cubic yards (310 cubic meters) of concrete were poured onto the foundations, carried by as many as 40 trucks. On December 17, 2006, a ceremony or $1,150 per square foot The lease also covers 30,000 square feet (2,800 m 2) of usable space in the podium and ... Read Article
OUTLINE SPECIFICATION - Welcome To The City Of Lowell ...
C. Fasteners for poured-in-place concrete deck shall be as recommended and accepted by Not to exceed amount shown in Section 2.1 of ANSI/AAMA 101 and not greater than 0.06 cubic feet per minute maximum per square foot of Provide glued-down carpet without cushion at floor areas ... View Full Source
ARTICLE 1
(16) inches wide poured concrete with top of footing to be sixteen (16) inches below grade motor hotel provided the site shall contain not less than six hundred square feet per rental unit and one thousand square feet for each apartment and the feet above the ground. Lighting. ... View This Document
Building Systems And Standards - Facilities Planning And ...
Provide lighting in landscaped areas that enhances security. Primary paths shall be concrete, a minimum of 6 feet wide. University Standard: All walks shall be poured concrete, The cost of the use of the machines is factored into the cost of housing so no data is required for control ... Access Document
2004 Vs 2007 Florida Building Code
And for which the estimated cost is $50,000 or more for a building that is The bathing load for wading pools and interactive water features shall be established by averaging one person per 20 square feet of pool area and Underwater lighting shall be a minimum of ½ watt per square ... Return Doc
PART 1
Where curbs are provided, poured in place concrete or reinforced extruded curbs shall be used. Minimum Turning Radius – The minimum inner turning radii for vehicles shall be as shown below: Lighting at Parking Areas 125 to 150 feet per minute. ... View This Document
DG 415-2
Slab-On-Grade. The concrete compressed strength may be 3,000-4,000 pounds per square inch, twenty CONC/H - Clear Liquid Hardener/Sealer over exposed concrete. CPT - Carpet twenty-six to twenty-eight (26-28 All workbay aprons for all shops will be rigid concrete sixty feet (60') ... Get Document
Www.in.gov
100 242.76 4.08 269.28000000000003 93.84 0 93.84 17.34 33.660000000000004 128.52000000000001 5.0999999999999996 162.18 31.62 17.34 116.28 24.48 61.2. 125 256.02 ... View Doc
Carroll & Douglas Counties Villa Rica, Georgia
2.71 Acres improved with 35,834 square feet. (Industrial ceiling tiles and lighting, painting, emergency lighting, and break room cabinets. Additionally, in 2008 ceramic tile flooring was installed in two of the offices. Floor Covering - Commercial grade carpet except for the restrooms ... Read Content
DEPARTMENT OF VETERANS AFFAIRS - Log In To Veteran's Affairs ...
C. Adhesive Walk-off/Carpet Walk-off Mats, (3000 psi) concrete, poured separately from the footings. 3. Do not tamp earth for backfilling in footing bottoms, except as specified. E. Trench Earthwork: (25 pounds per 1000 square feet). ... Get Doc
Agency Request - All Agency Projects 09/2003
Request: Requests: (1) authority to construct various maintenance and repair projects at an estimated total cost of $ and the original poured concrete 03K2K - Andersen Library Carpet Replacement ($359,400): This project will replace 56,925 square feet of broadloom carpet on ... Content Retrieval
COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND
Lighting and Mechanical Equipment. Part 7. Parking The development schedule and cost estimates for all new square feet in area shall be provided per each Urban Neighborhood. Civic Greens or Squares shall be measured independent of the surrounding right-of-way. The ... Read More
PERFORMANCE ZONING ORDINANCE - Havana
Examples of permanent foundations are, but are not limited to, poured concrete footings, poured concrete slabs, grade beams, block foundation wall and poured-in-place piers. feet per second. 100 feet of frontage over 500 feet Internal lighting 40 square feet plus 5 square feet. ... Fetch This Document
DIVISION 1 - Log In To Veteran's Affairs Vendor Portal
Coal tar seal, etc. when entering Station buildings. The Contractor shall be responsible for the cost to clean or replace carpet or floor Payment will be made at the contract unit price per square yard for Foundation bolts shall be placed in forms when concrete is poured; bolts ... Access Doc
FM Terms And Abbreviations Standard - Central Michigan University
One thousand gallons per hour One thousand square feet Opaque Open web steel joists Opening Operable concrete pipe 15915 carpet 16270 16400 closet rod; control room American Association of Cost Engineers American Concrete Institute American Gas Association ... Retrieve Here
No comments:
Post a Comment